You can make a utility request here.
Engineering Document Center
Welcome to the Engineering Department's Document Center. Below you will find links to various resources. If you have any questions, you can reach us using the information under the contact section.
All new private development project drawings submitted must meet the requirements of the current version of the City of Grand Rapids CAD Standards.
Links to access and download the current CAD Standards Guide as well as other related items are included below.
Downloads
AutoCAD Files
AutoCAD Templates (Civil 3D Styles Template not included)
Standard Construction Specifications
For any questions regarding Standard Construction Specifications, please contact redbook@grcity.us.
Current Edition:
- Standard Construction Specifications - 2021 Edition, Revision 1.3 - 1/10/25
- Summary of Standard Construction Specification "Redbook" Changes - 2021 Edition, Revision 1.3 - 1/10/25
Archived Editions:
Grand Rapids MDOT Special Provisions
The ZIP folder linked below contains the current Grand Rapids MDOT Special Provisions (SP):
Grand Rapids MDOT Special Provisions
Last revised on11/10/25
Below is a summary of changes and guidance for consultants on how to use them for projects.
Summary of Updates:
- See Excel file in ZIP folder for all updates since previous versions.
- Pay Item Updates: SPs have been revised to match the City of Grand Rapids 2021 Standard Construction Specifications Revision 1.3 (the “red book”). Download to the red book can be found at this link: https://grandrapidsmi-us.govstack.com/departments/engineering/engineering-document-center/
- Formatting: MDOT formatting, punctuation, and abbreviation updates have been incorporated.
- Specified Products have been eliminated and products are included in each special provision.
Using the GR SPs on Your Project
Pay Item SPs are in the ZIP folder in the PDF titled: GR STD Special Provisions - (date)
- Start with the full SP PDF.
- Make a project-specific copy and remove all SPs that don’t apply. Be sure the associated bookmarks are deleted – this is required for MDOT review.
- Use Grand Rapids pay items wherever applicable. For example, use the item “Curb and Gutter, (width) by (thickness) inch pan, Det P-5” instead of MDOT F-4 curb. Details for these items are in the red book and must be included in MDOT submittals.
- If an item is not in the GR SP PDF, use the MDOT standard pay item.
Clauses, MOT, and Utility Coordination:
- Word documents in the ZIP folder will be filled out for every project.
Unique SPs:
- If a custom SP is needed, please contact Jim Herman for the template.
Additional Resources & Standards
For documents and resources related to Green Infrastructure Standards, Stormwater and MS4 Permits, and stormwater studies and reports:
Stormwater Permitting & Soil Erosion and Sedimentation
Green Infrastructure Standards & Green Infrastructure Guidance
Contact Us
Phone
616-456-3000
Fax
616-456-3828
Location
Engineering Department
300 Monroe Ave NW 5th Floor
Grand Rapids, MI 49503